Duncan Seawall is well known throughout Southwest Florida for their excellent marine contractor services. As they have built their resume and grown their business, they are one of the few contractors able to take on large commercial projects in addition to their residential services.
The Bird Key Yacht Club decided it was time for a face-lift. This face-lift would entail a new composite sheet piling seawall and complete dock reconstruction, spanning 10,648 square-feet. This project also included some dredging to increase the marina's depth to accommodate larger vessels as well as all new marina utilities including electric, plumbing, fire and fueling dock, and the addition of many new boat lifts.
Demolition, removal and reconstruction of Bradenton Beach’s 10,000 sq.ft. historic pier and boardwalk was awarded to Duncan Seawall in August of 2014. The large-scale, highly visible project included multiple utilities such as electric, water, fire suppression and lightning protection. The project was completed under budget and ahead of an already aggressive schedule much to the satisfaction of the City.
Constructed 5,260 Sq. Ft marina expansion, adding a total of 30 slips with accompanying boat lifts. Duncan Seawall was responsible for driving piles, substructure, composite decking, as well as all electrical aspects of the marina expansion. Duncan was selected for this project due to its large employee base as well as the in-house electrical department for a seamless project.
With 1,000 square footage of decking, there is plenty of room to enjoy the sunshine. The existing davit bases were left and reused as built-in seating. A 10,000lb. Golden Boat Lift is installed with pontoon bunk brackets. Attached to the dock is an aluminum retractable ladder and a kayak roller for easier kayak launching. Around the upland deck is painted Hardy backer board trimmed and capped with Trex decking to make this a truly one of a kind dock.